Knockdown rebuild in Sydney: the five stages
Once you have decided to keep the land and replace the house, the work has an order. Demolition is the part people picture. It is not the part that decides whether the job runs cleanly.
If you have not yet decided between a rebuild and a renovation, read Knockdown rebuild or renovate: how to decide first. This article assumes that choice has already been made.
A knockdown rebuild is not three separate jobs — a demolisher, then a designer, then a builder — stitched together by the owner. Done properly it is one program on one contract: the existing house is understood, the new house is designed and approved against the same block, the old one comes down, and the new one is built and handed over by the same person who priced it.
At Birch those stages are: site and brief, design, approvals and price, demolition, then the build and handover. They are the same stages sketched on our knockdown rebuilds page; what follows is what each one actually involves, and what you should be holding at the end of it.
1. Site and brief
The address is still the most useful thing you can send, and on a rebuild you send the house as well as the land.
The first site visit is a walk through the existing building and the block it sits on — fall, access, trees, sewer, easements, orientation, and what the neighbours have already been allowed to build. Some of that decides the new house. Some of it decides how the old one comes down: access for machines, where a skip can sit, how close the boundary is, whether the house shares a wall or a service with anything next door.
It is also the moment to be honest about what you want the new house to do, roughly what you have to spend, and when you would like to be in. Nothing is signed at this stage. You should leave it with a straight answer on what the site will take, what it will make difficult, and whether the brief is reachable at the budget you have — including, if it is not, hearing that then rather than after a design is drawn.
Two checks belong here rather than later. Heritage listing or a conservation area can make demolition difficult or impossible; that is a planning certificate question, and it should be asked before anyone falls in love with a new floor plan. Asbestos is common in Sydney houses of a certain age and changes the cost of any work that disturbs it, demolition included. Neither is a reason to panic. Both are reasons not to guess.
2. Design
The new house is drawn around the block you are keeping, not around the footprint you are about to lose — except where that footprint is itself an asset.
An existing house may sit closer to a boundary, or take a height, that today’s controls would no longer allow. If that position is worth keeping, the design has to know it at the start. If it is not, the new house should take the chance to sit better on the land than the old one did: living rooms toward the north, the garage where the access actually works, the pool (if there is one) set into the levels while the ground is still open.
At Birch the drawings are done by the architect we work with, with Brad involved from the first sketch — suggesting, questioning and pricing as the plans develop. That is what stops a design being drawn in one place and priced somewhere else, after it is already too late to change the thing that is blowing the budget.
Bring any existing survey, drawings or approvals you already have. They are useful. They are not automatically the right starting point for the new house.
3. Approvals and price
In NSW the new house will go through a DA or a CDC. Which path is available depends on the block and on what you intend to build on it, not on which one is more convenient. CDC is faster where the proposal fits the code; a DA is the path where it does not. The choice is worth making before the drawings are finished, because it changes both the program and the drawings.
Demolition has its own approvals and notifications. They should be sitting on the same program as the new-house consent, not organised later as a surprise.
The lump sum comes after the drawings, not before them. A number quoted before the design exists is a guess, and the gap between that guess and the real cost has to be found somewhere later. Birch prices a rebuild the same way it prices any other job: one inclusive figure, agreed before work starts, with provisional sums and prime cost items itemised so you can see which numbers are allowances and which are fixed.
Two costs sit outside that figure and are easy to under-cook on a rebuild. Living somewhere else for the whole program — rent, storage, a second move — is yours, and it runs from demolition to handover, not for “a couple of months while they knock it down.” Connections, levies and any consultant fees that belong to you rather than the builder should be in your own budget as well. None of these are hidden. They are just not in the contract, and they should not be a surprise.
Nothing is signed until the drawings are finished and the lump sum is on the table. The contract, when you do sign it, is with Buildabel Pty Ltd trading as Birch Residential, and it should cover demolition and the new build as one job, on one program.
4. Demolition
This is the stage that makes a rebuild feel different to a new house on a vacant block. It is also the stage that should not have its own builder, its own dates and its own set of arguments.
Services are disconnected, any hazardous materials that were identified are handled as they need to be, the house comes down, and the site is left ready for the new footings — not “mostly ready”, and not waiting on a second contractor to finish a job the first one thought was done. Access, neighbour notification and the protection of anything you are keeping (a tree, a fence, a driveway that has to survive a bit longer) are part of this stage, not extras.
Because demolition sits on the same contract as the house that follows it, the person who priced the job is the person who is answerable for the gap between the two. The site should not sit idle while ownership of the mess is being discussed.
You will already be living somewhere else. That is not optional on a rebuild; the site is a building site from this point to handover.
5. Build and handover
From here the job is a new house, with the advantages of an empty block and the memory of the one that was there before it.
Construction at Birch is conventional stick framing, built on site, which is why a wall can still move, a ceiling can lift or an opening can widen while the house is going up. Changes of that kind are normal; they should arrive as a written variation, priced and agreed before the work happens, not as a line on an invoice afterwards.
If there is a pool, this is the time to build it — set into the house and the level changes around it while the ground is still open, rather than dropped into a finished garden by a second company later. The same logic applies to retaining, the driveway and the landscaping that finishes the block. Our article on building the pool now or later covers when it genuinely makes sense to wait.
Handover is a walk through the finished house with the same person who quoted it. Defects are listed and closed out. Statutory warranty and Home Building Compensation Fund cover stand behind the work after you move in.
The weatherboard and render home at East Ryde, on this site, is a knockdown rebuild that has already been through these stages and is photographed as it stands.
A short way to hold the five stages
At the end of each stage you should be holding something specific:
- Site and brief — a clear view of the block and the existing house, and an honest answer on whether the rebuild is reachable.
- Design — drawings that belong to this land, priced as they develop rather than afterwards.
- Approvals and price — a consent path, a lump sum, and a contract that includes demolition and the new house together.
- Demolition — a site that is actually ready for a new house, on the same program as the one that follows.
- Build and handover — the finished house, walked with the person who priced it.
The nine-stage path that sits around this — first contact through to keys — is described separately in Our building process. The five above are the ones that are particular to replacing a house rather than starting with a bare block.
If you are looking at a house and thinking the land is right and the building is not, send the address and a rough brief. The next step is walking it together.