Ryde Duplex
Ryde · duplex pair

Suburban lots, duplex sites and knockdown rebuilds across the City of Ryde. Three of the eight completed homes on this site are here.
The area
Ryde is mostly established housing on lots between roughly 380 and 800 square metres, close enough to the city and the river to have been worth holding. That combination is why so much of the building work here is replacement rather than expansion.
Built here
The Ryde Duplex fits two dwellings and a pool onto a 385 m² site. Elliott House at East Ryde replaced the house that was on the block.

On a small block
On a 385 square metre duplex site there is no spare ground. The pool, the alfresco, the fencing and the setback planting all have to be designed at the same time as the house, because each one takes space from the others.
Where the outside is a second contract signed later, that co-ordination does not happen and the garden becomes whatever is left over. Here it is inside the same lump sum and the same program as the house.
Common questions
It depends on the frontage, the area and the controls that apply to the site. It is the first thing worth checking, because the answer changes what the land is worth to you as well as what you can build. Send the address and you will get a view.
Often, because in this area the land usually carries most of the value and the houses are old enough that repairing them stops making sense. It is still a question about your particular house rather than a rule.
Everything comes in over the front boundary, so the sequence matters more than it does on an open site: the parts that need machine access happen while there is still room for a machine. That is planned at the start, not improvised in month seven.
What we build here
New homes, knockdown rebuilds, renovations and additions, and the pools and landscaping that finish them — all on one lump sum contract with one point of contact.
A house drawn around your block and the way you live, not adapted from a catalogue plan.
View →Keep the land, replace the house. Demolition, approvals and the build on one contract.
View →Second storeys, ground-floor additions and whole-home reworks, priced before demolition.
View →The outside finished to the same standard as the inside, by the same team.
View →Credentials
No awards are listed on this site, because there are none to list. What is here instead is the paperwork, and every line of it can be verified without asking us.
Checkable on the NSW Fair Trading register in about a minute.
Cover arranged through icare NSW, issued per job before work starts.
Both bodies publish searchable member directories.
More than eighty projects across Sydney. Eight of them are documented here.

Start a conversation
No obligation, no sales appointment, and no number invented before anyone has walked the block.