Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Rear lawn, pool and alfresco

Brick Duplex Pair, Ryde

Bedrooms
5
Bathrooms
3
Car spaces
2
Land
385 m²
Location
Ryde, NSW

Project overview

CompleteDuplex pair

Two homes on one block at Ryde, detailed so that neither reads as half of something else. Face brick to the street, with the party wall handled so the pair sits as two houses rather than one building split down the middle.

Five bedrooms, three bathrooms and a pool on 385m² is the whole point of the exercise: the plan runs kitchen to dining to living in one line and opens to a covered alfresco, lawn and pool, so the small footprint never reads as a compromise.

The build

Two homes that both get the yard

A duplex where neither dwelling is the compromise — both open to a level yard, both get the light.

The pair from the street
The rear yard, pool and lawn
Living opening straight out to the terrace
Dining and kitchen
The island bench and cooktop
The terrace
The second dwelling's kitchen
A front room

On site

Outside finished with the inside

Pool, alfresco and paving were part of the contract, not a second project the owners had to organise afterwards.

Under the alfresco roof, looking down the yard