Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Linden House, street elevation

Linden House

Bedrooms
4
Bathrooms
3
Car spaces
2
Land
360 m²
Build type
New build
Location
North Kellyville, NSW

Project overview

CompleteNew home

A two-storey home on a corner block that falls away from the street, with the ground floor held on a stone base and the garaging tucked underneath rather than pushed out in front.

Pale weatherboard above, a light roof, and a balustraded verandah wrapping the upper storey, so the height reads as two clear storeys rather than one tall elevation.

The build

A house that works with the fall

A sloping block, taken as an advantage: the garage goes underneath and the living floor lifts to the view instead of fighting the grade.

The house stepping down the slope
Kitchen island looking through the dining table to the living room
Covered alfresco with the outdoor kitchen, looking out to the trees
Galley kitchen running through to the butler’s pantry
Living room, with sheer curtains over the bi-fold doors
The stone fireplace between the double-hung windows
Woven brass pendants over the island
Bathroom vanity against marble herringbone and gloss subway tile
Herringbone tiles under the arched rangehood

On site

Weatherboard, stone and shutters

A Hamptons vocabulary held to a straight line, so the elevation stays calm at street level.

Outdoor lounge and fire pit against the weatherboard