Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Marlowe House interior

Marlowe House

Bedrooms
5
Bathrooms
6
Car spaces
3
Land
700 m²
Floor area
550 m²
Build type
New build
Location
Bella Vista, NSW

Project overview

Under developmentNew home

A new home at Bella Vista, currently under development. Full-height joinery through the butler’s pantry and robes, stone to the wet areas, and oak floors run through the living level.

Photographed before a stick of furniture went in — the only time you see the joinery, the panelling and the stone doing the work on their own.

The build

Planned around one long sightline

Kitchen, living and terrace on a single axis, so the ground floor reads as one room with the glazing at the end of it.

The main living room, opening to the terrace
The kitchen and island bench
The upstairs sitting room and its balustrade
The upstairs hall and the void
Kitchen tap and window
Joinery and brass pulls
The chandelier
Wrought iron, and the joinery beyond
The main bathroom
The stair and its iron balustrade
Down the hall
Panelling in the afternoon
The void, from the landing

On site

The finishes carry it

Marble, panelling, joinery and iron — an interior where nothing is standing in for something better later.

The main bathroom, bath and shower in marble