
Rosedale House
- Bedrooms
- 5
- Bathrooms
- 4
- Car spaces
- 4
- Land
- 7,284 m²
- Floor area
- 800 m²
- Build type
- New build
- Location
- Cattai, NSW
Project overview
A single-storey home laid out along its long axis on a 7,290m² block at Cattai, set well back from the road behind a columned verandah, with the garaging pushed to one end so the house reads as one low roofline.
Behind it the ground opens to a pool and pool house, with the fall of the land held by sandstone retaining and the whole rear garden landscaped rather than left as lawn. At 412m² internally, the block does as much work as the building does.
The build
A long, low house on open ground
Two hectares at Cattai. Single storey and wide, so the house reads as part of the paddock rather than an object dropped onto it.









On site
Verandah on every side
The colonnade wraps the plan, which is what makes an acreage house liveable through a Sydney summer.



