
Formal New Home, Bella Vista
- Bedrooms
- 5
- Bathrooms
- 6
- Car spaces
- 3
- Land
- 700 m²
- Floor area
- 550 m²
- Build type
- New build
- Location
- Bella Vista, NSW
Project overview
A new home at Bella Vista, currently under development. Full-height joinery through the butler’s pantry and robes, stone to the wet areas, and oak floors run through the living level.
Photographed before a stick of furniture went in — the only time you see the joinery, the panelling and the stone doing the work on their own.
The build
Planned around one long sightline
Kitchen, living and terrace on a single axis, so the ground floor reads as one room with the glazing at the end of it.













On site
The finishes carry it
Marble, panelling, joinery and iron — an interior where nothing is standing in for something better later.



