Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Pool, cabana and the rear of the Annangrove acreage home

White Weatherboard Acreage Home, Annangrove

Bedrooms
5
Bathrooms
5
Car spaces
4
Land
2.02 hectares
Floor area
650 m²
Build type
Renovation
Location
Annangrove, NSW

Project overview

CompleteAcreage home

Two hectares of acreage, with a level building platform cut into it and the pool set on axis with the rear pavilion. A putting green follows the fall of the land beyond the pool fence, and an existing firepit terrace sits in the trees past that.

The alfresco runs the width of the rear elevation under one continuous roof, with stone-clad piers and a raked ceiling, so the 650m² of floor area and the lawn read as a single room in good weather. Inside there is a games room, a playroom and a bar alongside the main living.

The build

Built for the whole block

Two hectares at Annangrove, where the house, the cabana and the pool were planned as one place rather than a building and then a backyard.

The house from the front, above the succulent terrace
The rear elevation across the lawn, cabana and pool beyond
Pool, loungers and the glazed cabana
Kitchen, island bench and rattan pendants
Brass tapware
The sandstone fire bowl
The front doors
Sandstone cladding
From inside the cabana, looking out
Straight down over the pool and cabana
The stair, seen in the hall mirror
Guest bathroom
Wall light
Afternoon light across the crazy paving

On site

Set on axis with the pavilion

The pool and pool house belong to this renovation. The fire bowl and terracing beyond the fence line came before it.

The whole property from the air — pool, putting green and lawn