Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Brick Acreage Home, Cattai, front elevation across the lawn

Brick Acreage Home, Cattai

Bedrooms
5
Bathrooms
4
Car spaces
4
Land
7,284 m²
Floor area
800 m²
Build type
New build
Location
Cattai, NSW

Project overview

CompleteNew home on acreage

A single-storey home laid out along its long axis on a 7,290m² block at Cattai, set well back from the road behind a columned verandah, with the garaging pushed to one end so the house reads as one low roofline.

Behind it the ground opens to a pool and pool house, with the fall of the land held by sandstone retaining and the whole rear garden landscaped rather than left as lawn. At 412m² internally, the block does as much work as the building does.

The build

A long, low house on open ground

Two hectares at Cattai. Single storey and wide, so the house reads as part of the paddock rather than an object dropped onto it.

The front elevation across the paddock
The pool and alfresco at the rear
The entry gable, framed past a stone pier
The house and pool from the north
The portico
The garaging
The full width of the house from the lawn
The colonnade along the verandah
A lantern on the brickwork

On site

Verandah on every side

The colonnade wraps the plan, which is what makes an acreage house liveable through a Sydney summer.

Straight down over the two hectares