
Weatherboard and Stone Home, North Kellyville
- Bedrooms
- 4
- Bathrooms
- 3
- Car spaces
- 2
- Land
- 360 m²
- Build type
- New build
- Location
- North Kellyville, NSW
Project overview
A two-storey home on a corner block that falls away from the street, with the ground floor held on a stone base and the garaging tucked underneath rather than pushed out in front.
Pale weatherboard above, a light roof, and a balustraded verandah wrapping the upper storey, so the height reads as two clear storeys rather than one tall elevation.
The build
A house that works with the fall
A sloping block, taken as an advantage: the garage goes underneath and the living floor lifts to the view instead of fighting the grade.









On site
Weatherboard, stone and shutters
A Hamptons vocabulary held to a straight line, so the elevation stays calm at street level.



