
Formal New Home
Bella Vista · under development

Estate lots, design guidelines and tighter blocks in the Hills district — home ground since 2011. Our postal address is Norwest, and the formal new home at Bella Vista is under development now.
The area
Bella Vista and the streets around Norwest are the newer estate side of the Hills district, not the acreage. The blocks are tighter, the neighbours are closer, and in many cases a set of design guidelines or a covenant governs materials, roof form and fencing before anyone draws a line.
Built here
The formal new home is on an estate lot at Bella Vista, currently under development. Elsewhere in the Hills district, the weatherboard and stone home is a two-storey build on a sloping corner block at North Kellyville, and the Annangrove acreage home sits on two hectares.

Formal New Home, Bella Vista
Kitchen, living and terrace sit on a single axis, so the ground floor reads as one room with the glazing at the end of it. Full-height joinery runs through the butler’s pantry and robes, with stone to the wet areas and oak floors through the living level.
Marble, panelling, joinery and iron — an interior where nothing is standing in for something better later.
Common questions
No, but it needs to be in front of the designer at the start rather than at approval stage. Guidelines usually govern materials, roof pitch, garage width and fencing, and they are much easier to design to than to design around.
Yes. Keep the land, replace the house — demolition, approvals and the new build run as one job on one contract. Whether the new house goes through a DA or a CDC depends on the block and what you intend to build on it.
No. Our postal address is PO Box 6133, Norwest NSW 2153, but Birch works from site rather than a display office, so there is no showroom to visit. Meetings happen on your block, which is the more useful place to have them.
Send the address and a rough brief. The next step is walking the block together. Nothing is signed until the drawings are finished and the lump sum is on the table.
What we build here
New homes, knockdown rebuilds, renovations and additions, and the pools and landscaping that finish them — all on one lump sum contract with one point of contact.
A house drawn around your block and the way you live, not adapted from a catalogue plan.
View →Keep the land, replace the house. Demolition, approvals and the build on one contract.
View →Second storeys, ground-floor additions and whole-home reworks, priced before demolition.
View →The outside finished to the same standard as the inside, by the same team.
View →Credentials
Every line of the paperwork below can be verified without asking us.
Checkable on the NSW Fair Trading register in about a minute.
Cover arranged through icare NSW, issued per job before work starts.
Both bodies publish searchable member directories.
More than eighty projects across Sydney. Eight of them are documented here.

Start a conversation
No obligation, no sales appointment, and no number invented before anyone has walked the block.