
Ironwood House
- Bedrooms
- 4
- Bathrooms
- 3
- Car spaces
- 3
- Land
- 2,004 m²
- Floor area
- 500 m²
- Build type
- New build
- Location
- Pitt Town, NSW
Project overview
A single-storey home on a 2,004m² block at Pitt Town that falls away to the rear. Sandstone retaining holds the front garden level with the street, and the ground steps down behind the house to a pool and covered alfresco.
Dark face brick and a dark roof throughout, with the entry recessed under the main roof rather than expressed as a separate portico, and garaging for three.
The build
A single-storey home on a level block
Straightforward massing, deep eaves and a dark roof, built at Pitt Town on open ground.



On site
The back of the house does the work
A covered terrace the width of the living rooms, opening onto the pool and the lawn.


