Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Rendered Duplex Pair, Ryde, street elevation

Rendered Duplex Pair, Ryde

Bedrooms
6
Bathrooms
5
Car spaces
2
Land
700 m²
Floor area
334 m²
Location
Ryde, NSW

Project overview

CompleteNew home

A rendered two-storey home on a 700m² block at Ryde, with the massing squared up to the street and the garage absorbed into the ground floor rather than pushed out in front of it.

Six bedrooms and five bathrooms inside 334m² is a lot of room count for the footprint, and the plan carries it without the elevation looking crowded. A low slatted fence and planting hold the boundary, and a full-height timber door breaks the render at the threshold.

The build

Two dwellings, one elevation

A duplex pair at Ryde drawn as a single composition, so the street sees one building rather than two half-houses.

The pair from the street
The wider street elevation
Driveways and garaging
The front door

On site

Held down by the fence and the planting

A low slatted fence, dracaena and a single render tone keep the frontage quiet.