Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Rear alfresco and pool

Dark Brick Home, Pitt Town

Bedrooms
4
Bathrooms
3
Car spaces
3
Land
2,004 m²
Floor area
500 m²
Build type
New build
Location
Pitt Town, NSW

Project overview

CompleteNew home

A single-storey home on a 2,004m² block at Pitt Town that falls away to the rear. Sandstone retaining holds the front garden level with the street, and the ground steps down behind the house to a pool and covered alfresco.

Dark face brick and a dark roof throughout, with the entry recessed under the main roof rather than expressed as a separate portico, and garaging for three.

The build

A single-storey home on a level block

Straightforward massing, deep eaves and a dark roof, built at Pitt Town on open ground.

The house from the street
The rear elevation, terrace and pool
The approach and garaging

On site

The back of the house does the work

A covered terrace the width of the living rooms, opening onto the pool and the lawn.